Industrial Engineering

No Thumbnail Available

Date

2019-12

Journal Title

Journal ISSN

Volume Title

Publisher

Daffodil International University

Abstract

This thesis paper contains the overall procedure of Industrial Engineering (IE) in the garments industry. We have visited on Robintex Group at Vulta, Rupganj, Narayanganj to research the operation breakdown, standard minute value (SMV), production target, efficiency%, capacity, labor productivity, method study, time study, performance rating calculation and its related data as the Industrial Engineer working procedure. We have completed our research to gained depth knowledge study on industrial engineering in the sewing section at normal sewing line and just in time (JIT) line. After applying all those, we have compared before and after situation of labor productivity and line efficiency. Finally proposed production layout has been modeled and ensures a better productivity. In this paper, we discussed some procedure about time, Capacity, Target, SMV, and production study and analysis of different method and also discussed about operation breakdown and other tools and techniques which consisted of different experimental discussion, experiment results and discussion this analysis can know about the different items of SMV, efficiency wise production variation. We are analysis four items operation bulletins as work dividing plan. We are achieved result of product SMV for Naomi Is Top 4.37, Tilly Solid 5.74, Erik Basic Fit Tank Top 3.80, Gabbi Tank 4.10. And also we have achieved result of product Efficiency% for Naomi Is Top 55%, Tilly Solid 52%R, Erik Basic Fit Tank Top 52%, Gabbi Tank 55%.

Description

Keywords

Garments industry, Industrial engineer, Experiment

Citation

Collections

Endorsement

Review

Supplemented By

Referenced By