Factors Affecting Bim Implementation

dc.contributor.author. Al-Mohammad, Mohammad S
dc.contributor.authorHaron, Ahmad Tarmizi
dc.contributor.authorEsa, Muneera
dc.contributor.authorAloko, Mohammad Numan
dc.contributor.authorAlhammadi, Yasir
dc.contributor.authorAnandh, K.S.
dc.contributor.authorRahman, Rahimi A.
dc.date.accessioned2024-03-25T05:48:11Z
dc.date.available2024-03-25T05:48:11Z
dc.date.issued2022-04-26
dc.description.abstractPurpose This study aims to empirically analyze the symmetries and asymmetries among the critical factors affecting building information modeling (BIM) implementation between countries with different income levels. To achieve that aim, the study objectives are to identify: critical factors affecting BIM implementation in low-, lower-middle-, upper-middle- and high-income countries; overlapping critical factors between countries with different income levels; and agreements on the critical factors between countries with different income levels. Design/methodology/approach This study identified potential BIM implementation factors using a systematic literature review and semi-structured interviews with architectural, engineering and construction (AEC) professionals. Then, the factors were inserted into a questionnaire survey and sent to AEC professionals in Afghanistan, India, Malaysia and Saudi Arabia. The collected data was analyzed using the following techniques and tests: mean, standard deviation, normalized value, Kruskal–Wallis, Dunn and Mann–Whitney. Findings Five critical factors overlap between all countries: “availability of guidelines for implementing BIM,” “cost-benefit of implementing BIM,” “stakeholders’ willingness to learn the BIM method,” “consistent views on BIM between stakeholders” and “existence of standard contracts on liability and risk allocation.” Also, the criticality of the factors often differs between income levels, especially between low- and high-income countries, suggesting a significant gap between low- and high-income countries in BIM implementation. Originality/value This study differs from prior works by empirically analyzing the symmetries and asymmetries in BIM implementation factors between countries with different income levels (i.e. low-, lower-middle-, upper-middle- and high-income countries).
dc.identifier.otherhttp://dspace.daffodilvarsity.edu.bd:8080/handle/123456789/11865
dc.identifier.urihttp://dspace.daffodilvarsity.edu.bd:8080/handle/123456789/11865
dc.language.isoen_US
dc.publisherDaffodil International University
dc.sourceDIU Institutional Repository
dc.subjectBuilding information
dc.titleFactors Affecting Bim Implementation
dc.title.alternativeEvidence From Countries With Different Income Levels
dc.typeArticle

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
10-1108_CI-11-2021-0217.pdf.txt
Size:
93.82 KB
Format:
Adobe Portable Document Format

Collections