Study on SMV and line balancing of garments

dc.contributor.authorZaman, Md.Tarek
dc.contributor.authorImtiaz, Md.Shamim
dc.contributor.authorMotaleb, Md. Abdul
dc.date.accessioned2018-08-08T04:47:42Z
dc.date.accessioned2019-06-10T10:24:43Z
dc.date.available2018-08-08T04:47:42Z
dc.date.available2019-06-10T10:24:43Z
dc.date.issued2018-04-06
dc.description.abstractWe completed our thesis on “Study on SMV and Line balancing of Garments”. This paper clearly explains the total operation of long sleeve shirt and SMV calculation. Total SMV of long sleeve shirt is 22.41 and we also done compare the before line balancing and after line balancing. At last we have seen this result summary that production are increasing by doing line balancing than before line balancing .To do line balancing production are increasing 21 per hours than before line balancing . After Line balancing gain Productivity increase, Smooth work flow, balanced cycle time, Easy fault finding, reduced bottleneck, balanced line efficiency, Reduction operation breakdown, and Equal distribution of work Skilled, semiskilled & unskilled co-ordination and Easy way to supervise.
dc.identifier.otherhttp://dspace.daffodilvarsity.edu.bd:8080/handle/20.500.11948/2765
dc.identifier.urihttp://hdl.handle.net/20.500.11948/2765
dc.language.isoen_US
dc.publisherDaffodil International University
dc.sourceDIU Institutional Repository
dc.subjectSMV and Line balancing of Garments
dc.subjectBalancing Method
dc.subjectClassifications of assembly line system
dc.titleStudy on SMV and line balancing of garments
dc.typeThesis

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
-SMV-and-Line-balancing-of-Garmentsnn-Diu_tarek_libarary_nnn.pdf.txt
Size:
67.89 KB
Format:
Adobe Portable Document Format

Collections