Coordination drawing of upper roof storey (Architectural As Built Drawings)
| dc.contributor.author | BUCG-ABC Joint Venture (BUCG-ABC JV) | |
| dc.date.accessioned | 2024-03-20T08:50:48Z | |
| dc.date.available | 2024-03-20T08:50:48Z | |
| dc.date.issued | 2023-07-01 | |
| dc.description | This record contains architectural as built drawings of Brac University New Campus Project. It consists of only PDF version of drawings. | |
| dc.identifier.other | Design no.: BRACU-AR-CA027-1 | |
| dc.identifier.other | https://dspace.bracu.ac.bd/server/api/core/items/144470d2-ceec-4bae-8e54-bd566ad9dd8b | |
| dc.identifier.uri | http://hdl.handle.net/10361/22551 | |
| dc.language.iso | en | |
| dc.publisher | Brac University | |
| dc.source | BRAC University Institutional Repository | |
| dc.subject | New campus project | |
| dc.subject | As built drawings | |
| dc.subject | Coordination drawings | |
| dc.subject | Upper roof storey | |
| dc.title | Coordination drawing of upper roof storey (Architectural As Built Drawings) | |
| dc.type | Drawings |
