Technical specification of W06 and W07 wall and window joint fixing (RFA-577_Rev. A & C)
| dc.contributor.author | BUCG-ABC Joint Venture (BUCG-ABC JV) | |
| dc.date.accessioned | 2023-09-19T04:39:15Z | |
| dc.date.available | 2023-09-19T04:39:15Z | |
| dc.date.issued | 2023-07-15 | |
| dc.description | This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings. | |
| dc.identifier.other | Ref. no.: RFA-577-A | |
| dc.identifier.other | Design no.: BRACU-AR-JD-01-5 | |
| dc.identifier.other | https://dspace.bracu.ac.bd/server/api/core/items/8cf0ee95-596a-4d8c-9b50-8a94803151a7 | |
| dc.identifier.uri | http://hdl.handle.net/10361/21000 | |
| dc.language.iso | en | |
| dc.publisher | Brac University | |
| dc.source | BRAC University Institutional Repository | |
| dc.subject | New campus project | |
| dc.subject | Architectural drawings | |
| dc.subject | Architectural designs | |
| dc.subject | Contractor shop drawing | |
| dc.subject | Curtain wall | |
| dc.title | Technical specification of W06 and W07 wall and window joint fixing (RFA-577_Rev. A & C) | |
| dc.type | Drawings |
