Study on Industrial Engineering in Woven Garments Production

No Thumbnail Available

Date

2021-05-04

Journal Title

Journal ISSN

Volume Title

Publisher

©Daffodil International University

Abstract

The ready-made garments (RMG) of Bangladesh has got a more preponderant facet than any other sector in terms of growth and foreign exchange earnings. This project is on “Study on Industrial Engineering in Woven garments production”. This paper inaugurates the various concepts utilizing method, time, limit and production study, it is conceivable to increase productivity while diminishing wastage. Work study took a record the actual individual capacity of per worker. we have enrolled the existent cycle time to per worker for each and every worker and helper to invent the ideal number minute of worker, category of machine, particular capacity. To find out style no:1, the standard minute value (SMV)=18.91, in additional to that we have counted the target=1269 pcs, pitch time=0.44, upper control limit=0.51, lower control limit=0.37, efficiency=100%, manpower= 40, capacity= 1078 pcs, labor productivity. To find out style no:2, the standard minute value (SMV)= 17.31, furthermore, we measured the target= 1386, pitch time= 0.39, upper control limit= 0.45, lower control limit= 0.33, efficiency=100%, manpower=40, capacity= 1138 and operator productivity. This paper addressed pants dimensions’ sheets for men, structure and procedure malfunction schedules, SMV estimate for each operation. Goal period calculation, command maximum, efficiency reduction, system wise capability, as we other research information methods and tools.

Description

Keywords

Textured woven fabrics, Fabrics, Clothing factories

Citation

Collections

Endorsement

Review

Supplemented By

Referenced By