CCNA Routing and Switching

dc.contributor.authorSaidy, Md Golam
dc.date.accessioned2022-07-30T06:14:08Z
dc.date.available2022-07-30T06:14:08Z
dc.date.issued2021-07
dc.description.abstractThis challenge evaluates the design of an undertaking system in a short amount of time. It examines the limits of planning, developing, and executing a venture plan. This project also addresses the methods for putting project-level systems into action. In this project, we'll start with basic switch configuration and then move on to the routing advancements needed to route data across branches. After that, we've implemented WAN, and frame-transfer is seen as a good choice since it connects several areas with a single switch interface, lowering equipment costs. As a result, we should pay attention to it and strive to achieve it in our future lives. That is why I chose "Temporary Position on CCNA Routing and Switching" as the topic of my paper on Computer Networking. The purpose of specific routing, switching, and addressing was described in the study. RIP is used for the Cisco Center convention, EIGRP is used for each systems administration framework, OSPF is also used for each convention, and VLAN is a one-of-a-kind convention. This is due to the necessity for a robust IT foundation in developing nations, which is undervalued in developed ones. Organizing an enterprise in a developing nation is a lot like organizing one in a desert.
dc.identifier.otherhttp://dspace.daffodilvarsity.edu.bd:8080/handle/123456789/8374
dc.identifier.urihttp://dspace.daffodilvarsity.edu.bd:8080/handle/123456789/8374
dc.language.isoen_US
dc.publisherDaffodil International University
dc.sourceDIU Institutional Repository
dc.subjectSwitching circuits
dc.subjectTelecommunication--Switching systems
dc.titleCCNA Routing and Switching
dc.typeArticle

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
183-15-12044.pdf.txt
Size:
50.02 KB
Format:
Adobe Portable Document Format