Initial social impact of the Rupsha bridge project in Khulna

dc.contributor.authorMurtaza, Mohammad G.
dc.contributor.authorM. Ghulam Sattar
dc.date.accessioned2019-12-29T03:42:17Z
dc.date.available2019-12-29T03:42:17Z
dc.date.issued1998
dc.description.abstractFallowing a decision by the government to construct a bridge over the river Rupsha in Khulna, a number of preparatory studies were undertaken on different aspects of the bridge project. An initial social impact assessment was a part of these studies. Two alternative sites have been considered for the bridge, and for that two alternative alignments of road have been proposed. Construction of the new road(s) would necessitate acquisition of land, involve displacement of people from their existing habitats, and affect these people in other ways both socially and economically. The study found that a total 454 households (174 in alignment A, and 280 in alignment B) would be affected if roads are constructed as per the proposed alignments. The total population involved is 2,571. . .<\round 60 per cent of these people were born in their existing villages, and the rest migrated from other places at different times. The two road alignments pass through periurbanlrural areas where a number of fish farms, small industries and commercial enterprises are located. A very large number of the income earners are involved in ' serivce' and non-farm vocations. Many women are also participating in income earning activities. Most of these people live quite close to their workplace. In the two alignments 45,847 trees will be affected. The findings incorporated some reactions of the people living in the project area. Their major concerns are loss of land including their ancestral homesteads, loss of current occupations and displacement. Some of the respondents even said that they did not need any more road in their locality.
dc.identifier.citationMurtaza, M. G., & Sattar, M. G. (1998). Initial social impact of the Rupsha bridge project in Khulna. Research Reports (1998): Social Studies, Vol – XXI, 237–270.
dc.identifier.otherhttps://dspace.bracu.ac.bd/server/api/core/items/0432862b-9482-4a64-9bd7-694f0deb8fd3
dc.identifier.urihttp://hdl.handle.net/10361/13356
dc.language.isoen
dc.publisherBRAC Research and Evaluation Division (RED)
dc.sourceBRAC University Institutional Repository
dc.subjectSocial impact
dc.subjectRupsha bridge
dc.subjectKhulna
dc.titleInitial social impact of the Rupsha bridge project in Khulna
dc.typeResearch Report

Files

Original bundle

Now showing 1 - 1 of 1
Thumbnail Image
Name:
Initial social impact of the Rupsha bridge project in Khulna.pdf
Size:
13.67 MB
Format:
Adobe Portable Document Format