Repository logo
Communities & Collections
All of DSpace
  • English
  • العربية
  • বাংলা
  • Català
  • Čeština
  • Deutsch
  • Ελληνικά
  • Español
  • Suomi
  • Français
  • Gàidhlig
  • हिंदी
  • Magyar
  • Italiano
  • Қазақ
  • Latviešu
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Srpski (lat)
  • Српски
  • Svenska
  • Türkçe
  • Yкраї́нська
  • Tiếng Việt
Log In
New user? Click here to register.Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Tahmina Ferdousi Lipi"

Filter results by typing the first few letters
Now showing 1 - 1 of 1
  • Results Per Page
  • Sort Options
  • Thumbnail Image
    Item
    Fuzzy multi objective machine reliability based hybrid flow shop scheduling
    (Department of Industrial and Production Engineering, BUET, 2007-01) Tahmina Ferdousi Lipi; Hasin, Dr. M. Ahsan Akhtar
    Many real-world schcduling problems are multi objGctlve and complex in nature, ThaI is, there e>."l scvcral critena lilal must be laken into consideralion when evaluatmg thc quality of thc proposed solullon or schedule. On the other hand consideration of machine rehabilit y is vcry important dllring job allocatioo in each stage to get a realistIC hyhrid flow shop ~chcdulc. This research aims to develop 1'1.'0fuzzy infercnee systems (F1S) fDr the hybrid flow ~hop pwblem, Fir~t FIS is used tD gel the priority of each jDh considering multiple objectives of proces5ing time, duc date and co;t over time. Second FIS is used tQ get machine rehabiIity and availability based priorily using lhe infomlalion of mean time to failure (MTTF) & mcan time to repair (MTTR) of each individual machine of each ~tage. Then the total load is balanced depcnding on !heir reliability and availabl1ity i.e., maximum utili,alion target are detenmlled. An algorithm is developed for grouping, sequencing & aIIDcating the JDbs to the machmes at every stage in such a way lhat tolal percentage Df over utilization is minimllJll. Accmding to this algorithm a cDmputing tDol;s developed and w,lh a case study the entire process i, explained,

© Open Research Bangladesh

  • Privacy policy
  • End User Agreement
  • Send Feedback