Browsing by Author "Foysal, Md."
Now showing 1 - 3 of 3
- Results Per Page
- Sort Options
Item A comparative analysis of financial performance between Viyellatax Spinning Limited and Square Textile Limited(BRAC University, 2019-09) Foysal, Md.; Ahmed, SalehuddinThe report on “A Comparative Analysis of Financial Performance between Viyellatax Spinning Ltd and Square Textile Ltd.” is based on working knowledge and interview from Viyellatax Spinning Ltd and Square Textile Ltd. The topic of the report was approved by Dr. Salehuddin Ahmed, Professor, BRAC Business School, BRAC University. The report mainly contemplates on the topic “A Comparative Analysis of Financial Performance between Viyellatax Spinning Ltd and Square Textile Ltd.” to know financial position of Viyellatax Spinning Ltd and Square Textile Ltd.. First part of this report is based on the introduction which includes topics like objective, methodology and limitation of the study. Basically it defines the overall research and consultancy situation along with a corporation. In the next part of the report highlights a brief background of Viyellatax Spinning Ltd with its mission, vision, objective, products etc. This report also includes the income statement and balance sheet of Viyellatax Spinning Ltd. Finally this report includes the comparative analysis between Viyellatax Spinning Ltd and Square Textile Ltd according to their financial performance and financial performance evaluation from different aspects and adds a small recommendation which may be helpful for the company.Item Online Catering Service(Daffodil International University, 2019-12-11) Foysal, Md.The experience to working with project is very important for corporate persons, Online Catering System is appropriate for these purposes. In addition, system will help user to get their lunch or dinner on time. User will be motivated for making new order and they actually save their time by using this system. Every Software development follows some rules and method, I also following some method to develop this project. My whole project work will follow the Agile Methodology. Which is the best software development process to develop a software. I choose it because my whole project needs to implement some part then test it and agile methodology will help me to reduce the project risk.Item Study on Criticality Minimizing Cost in Power System with Optimal Design of Stochastic Wind Power Generators using Moth Flow Optimization(IET, 2023-04-24) Alam, Mohammad Khurshed; Sulaiman, Mohd Herwan,; Sayem, Md. Shaoran; Chowdhury, Jannat Khair; Foysal, Md.; Ringku, Md.Mahfuzur AkterThe power grid, one of the most crucial components of smart cities, faces significant challenges in operating efficiently, dependably, and economically. One of these challenges is forecasting the demand for electricity. Grid managers can balance supply and demand properly while also minimizing operating expenses for generating and transmitting power. Thanks to accurate forecasts, while maintaining respectable system performance in terms of the limitations on the actual and reactive power output of the generator, bus voltages, shunt capacitors and reactors, transformer tap setting, and transmission line power flow. For a sustainable future and to meet the higher carbon emission standards that are being put in place, it is expected that the renewable energy sector will experience enormous development. The placement of wind turbines in a wind farm requires the use of evolutionary algorithms and power system optimization issues because the wake effect caused by upstream turbines impacts the output of downstream turbines, consequently diminishing the total power output from the wind farm. The current study using MFO determines a cost of $ 3160.0824 $/h for minimizing the cost of multiple fuels, which turns out to be the best price when compared to the legitimate results obtained by other algorithms. It results in a cost savings of 1.45% per hour when compared to the worst alternatives given by the comparison algorithm. According to simulation results on the IEEE 30-bus network with six generators, this approach might offer the best solution right away. A further study found that this method works best for medium-scale power installations.
